成人毛片免费观看视频欣赏,亚洲一区二区三区久久,欧美亚洲一区二区视频,亚洲AV日韩AⅤ一二三区

產(chǎn)品banner
Your current location : Home >> 吉林zinc series phosphating solution

Contact UsContact Us

Yingkou kangru Technology Co., Ltd

Contact: Mr. Zhao

Telephone: +86-18841775200 

Address: Steel Industrial Park, Laobian District, Yingkou City, Liaoning Province

Post Code: 115005

Website: http://www.w7986.com/en



吉林Steel pipe drawing phosphating solution

吉林Steel pipe drawing phosphating solution

  • Cname:吉林zinc series phosphating solution
  • Views:Times
  • Release date:2021-01-11 11:14:46
  • Content

After treatment, a dense and uniform phosphate film is formed on the surface of the workpiece, which is widely used in the drawing of all kinds of steel pipes and the lubrication of stamping parts. The phosphating solution has the advantages of low treatment temperature, fast film formation, easy control and low cost.


1、 Main technical specifications

Projects

Technical index

Test standard

appearance

Light green transparent liquid

Visual inspection

Acid value 6%

Free acid(FA)  Pt

4.0±0.3

Neutralization method

Total acid(TA)  Pt

22±1.0

proportion  g/ml

1.35±0.05

Specific gravity method

Appearance of phosphating film

grey

GB6807-86

2、 Main features




1. In the process of use, the accelerator should be added separately, and the same agent should be used in the tank and the addition, so the operation is simple and the management is convenient.




2. This product has good stability, less sediment and long service life.




3. The phosphating film has dense crystal, gray and no ash, which can enhance the lubricity of steel pipe and reduce the comprehensive cost.




3、 Application method and process parameters




1. Treatment process: rust removal → neutralization → water washing → phosphating → water washing → wetting agent




2. The phosphating solution was prepared into 8% working solution, and neutralizer and accelerator were added per ton to make it dissolve and stir evenly.




3. Process parameters:




FA: 1.5 ~ 2.5pt, treatment temperature: 55 ~ 65 ℃




TA: 24 ~ 34pt, treatment time: 5 ~ 10min, accelerator AC: 2 ~ 5pt




4. As the concentration changes continuously in the continuous treatment process, it is necessary to measure the concentration of each index regularly to keep each index within the specified process concentration range.




4、 Packaging, storage and transportation




30kg plastic barrel packaging, storage and transportation temperature not less than 0 ℃.


Tags

0

Recently Viewed:

Copyright ? Yingkou kangru Technology Co., Ltd support: Yingkou Zhongchuang Network Technology Co., Ltd